Articles Civil Project Management Review
BIM and Project Management
Practices for the implementation of Building Information Modeling in the organizational processes illustrated in the book by Andrea Ferrara and Eva Feligioni.
I deal with the management of Engineering Procurement & Construction projects, with the planning and control of the work scheduling, taking care of reports, processing sheets and project S-curves.
Project Management software expert such as Oracle Primavera P6 and Microsoft Project Professional. Trainer on project management theories and trainer on the main Project Management information systems.
I am accredited as a Technical Consultant for Claims on time schedules and in ComputerForensic, with Judicial institutions and Legal Studies and I have established mutual collaborations with other Professionals, Engineers and Consulting Companies.
On behalf of PMPI Spa I manage commercial contact with customers, the selection and training of consultants, the creation of offers for consultancy and projects.
I therefore coordinate the implementation of projects in project management, maintenance engineering, training.
the application of knowledge, attitudes, tools and techniques to the activities of a project in order to achieve its objectives. Project Management EPC - Turn key schedule design, update, control ad reporting,
Technical Consultant of Office and Party. Analysis of digital crime bodies, data recovery and investigative analysis on IT devices. Analysis of claims on contracts and time schedules.
APE: Energy Performance Certification licensed by CENED n. 17655
APE: Energy Performance Certification licensed by Regione Liguria n. 4809
APE: Energy Performance Certification licensed by SIPEE n. 109630
Real estate development, commercial, production and residential, comparative assessment of properties and properties, development of contacts and search for opportunities for customers, investors, builders.
This Wordpress site, its SEO positioning and the Social campaigns that make it visible.
I also manage pages on behalf of professionals, companies and associations. Management of recruiting campaigns on Linkedin.
Training on: Project planning and control methodologies, Basic and advanced use of Ms Project and Oracle Primavera P6. Security awareness: awareness of the risks on digital information.
Andrea conducted a seminar in the company that I found extremely valuable. He demonstrated a high level of competence and his presentation was clear and immediately feasible. His way of communicating was open and inviting to questions (he expressed appreciation for them) and he willingly gave his time to answer the questions thoroughly. Andrea is extremely enthusiastic about his work which is contagious. I would certainly recommend it for any training on this topic.
Andrea was a precious support of the Technical Director and of the Construction Site Manager for the EPC activities in the planning and control of a construction plan of over € 300 million.
• To manage the #039 contractor, the subcontractors and the Customer.
• Planning and management of service providers, materials and services of #039, works, Italians and foreigners and subcontractors
• Definition of the project WBS, elaboration of the work plan and analysis of the logical connections between Engineering. Procurement and Construction activities, with continuous reference to the metric calculation and other technical literature in the project and drawings.
Andrea held an advanced course for #039, using Primavera P6 at our Oil & Gas extraction company. I noticed a profound aptitude for bringing the class closer and making communication fluid. In addition to considerable experience, given by his work at large construction sites but also in different business sectors. He immediately put us at ease making us simulate work situations and making 5 days of training interesting. Andrea is extremely enthusiastic about his work, which is a mixture of construction site work and classroom training, which makes it very credible. I would like to work more often with our company because he knows what it's like to involve rather than bore.
• Monitoring of the plan and possible addition of additional initially unforeseen activities;
• Design of S-production curves / expected revenues (general, engineering, procurement and construction) and actual baseline Vs. planned
• Definition and standard processing of the report set: work plan, CP analysis, S curve, table of project milestones and float management.
• Preparation of periodic reports for the site manager regarding the progress of the work.
In the project management office team of the project on Cold Nuclear, for the construction of the vacuum chamber, the heart of the ITER project, and other important components, such as superconducting coils and divertori.
Practices for the implementation of Building Information Modeling in the organizational processes illustrated in the book by Andrea Ferrara and Eva Feligioni.
Here is a series of updated news on Planning & Project control, including information on the use of the most popular planning software (Primavera P6 / Ms Project)
Here is a series of updated news on the topics of Project Management according to the PMI methodology, including information on the methodology and certification.
Hi how are you? If you have come this far you may need to speed up the execution of the Oracle Primavera P6 application. The short guide refers to installations with the local Spring DB PPMDBSQLite.db and to Read more...
How to install an evaluation copy of Oracle Primavera P6 PPM: in this article we will see how to install an evaluation copy on our PC without technical usability limitations